![&MaxW=640&imageVersion=default&AR-150529478[1]](http://www.abudhabi2.com/wp-content/uploads/2015/05/MaxW640imageVersiondefaultAR-1505294781.jpg)
Work began in December 2014 and involved providing three lanes to enable smooth access to the junction of Qasr Al-Bahr tunnel for motorists coming from Hazza bin Zayed Street. As a result, traffic intake has increased and traffic flow has been streamlined on Sheikh Zayed Street.
Road works also included a new traffic signal at the right-hand exit for inbound and outbound traffic from Hazza bin Zayed Street. Motorists can now pass through this signal to enter the Qasr Al-Bahr tunnel or use the junction on Delma Street at the Qaser Al Bahr signal.
Other improvement projects were rainwater drainage networks, replacing barriers and plastic cones with a more flexible metal barrier, modifying the lanes at the exit of Sheikh Zayed Tunnel, adding new lanes and merging a lane on Sheikh Zayed Street. Details